Option #1: Create a Work Breakdown Structure (WBS)—Essay Based on the course readings and your research, write an essay that addresses the following key elements:Project scopeIn your own words, with

Option #1: Create a Work Breakdown Structure (WBS)—Essay 

Based on the course readings and your research, write an essay that addresses the following key elements:

  • Project scope
    • In your own words, with cited support from scholarly resources, clearly and concisely define the construct of a project Scope Statement. 
    • Explain the use of a common technique to develop a project scope.
    • Describe the practice for achieving project scope consensus.
  • Project work breakdown structure (WBS)
    • In your own words, with cited support from scholarly resources, clearly and concisely define the construct of a project work breakdown structure (WBS).
    • Based on the project elements presented in Problem 11-2 (Kerzner, 2017, p. 404) (I have included this), use a software application of your choosing to create a WBS (down through level 3). Include your WBS as an appendix to your essay.
    • Describe how your WBS can be used to plan this project scenario. 

Additional InstructionsProperly organize your writing by including the following:

  • Cover page
  • Introduction
  • Body of your work in response to the assignment’s key elements, with headings and subheadings
  • Conclusion
  • List of references
  • Appendix (WBS).

The introduction through conclusion sections of your essay should be approximately 4-5 pages in length. Support your assignment with a minimum of three scholarly references. The CSU-Global library is a good place to locate these sources, and the Project Management Resources Guide (Links to an external site.)Links to an external site. is a great place to start. The written section should follow the CSU-Global Guide to Writing and APA (Links to an external site.)Links to an external site.standards. 

“Get 15% discount on your first 3 orders with us”
Use the following coupon
FIRST15

Order Now